Traffic Coating

Jun 19th, 2012 | Traffic Coating
Problem:
The suspended concrete parking deck had cracked over time with settling and movement, allowing water to leak through to ...
Nov 10th, 2008 | Traffic Coating
Problem:
The second-level parking deck was a 12″ concrete slab with a 4″ asphalt overlay and was leaking badly into t...
BBB Accredited Business